Given: Plinth area = 1000 Sqm and rate = Rs. S L Gupta (Civil Engg) Join date: Mar 2008. Accordingly this office has prepared an estimate on the basis of CPWD Plinth Area Rate 2012 for Construction of Hospital and adopting specification as per Annexure-II and green building norms.

Plinth Area Cost Estimate. (Types of estimates in construction) Plinth area estimate – This estimate is an approximate estimate it is consists of workout the plinth area of a building which is multiplied by a building that is multiplied by the plinth area rate to get an estimate for that building. Join date: May 2014. So its plinth area cost estimate is 150 * 2000 = 300000 rs.

Total Cost = R709,680 Building with Open Spaces For example, if we want a plinth area calculation of 100 sq.m in a specific region and the plinth area cost of a building in the same region is 2000 per sq.m then, we can easily find out plinth area estimate: 100 X 2000 = 200000.

i) Plinth area rate Rs.

The plinth area is worked out by calculating the length x breadth of the project at floor level.

Total Cost = 88.71m2 x 8000 . Approximate Quantity Method Cost Estimate.

The Plinth Area of the building is calculated. Plinth Area Rates w.e.f. Problems on Plinth Area Method 1. The different types of estimates include: ... Plinth Area – Covers the external dimensions of the structure and includes factors like the foundation type, roof construction, materials, and finishes. Given that. Solution, From the drawing, it is clear that the thickness of the external wall is 13.5”. 20 to 25%. Even if the plan of the proposed building is not ready, the floor areas of different units (i.e. But, The area of the courtyard etc.

Next, the plinth area estimate relates to the categories of cost estimates. Plinth area means the area which is covered by the floor at the ground. is approximate estimate Plinth area should be calculated for covered area by taking external dimensions of the building at the floor level Courtyard and other open area should not be included For multi storeyed building Plinth Area for each storey is determined separately.

Supplementary Cost Estimate. 2.

It is the wall to wall distance which makes for the net usable floor area of the house. What percentage of estimate cost is charged for centage charges? We can’t consider open areas, lawns, etc. meter) x Rate of cost in per sq. In this video we will learn about how to find preliminary estimate by plinth area estimate method For public buildings, cost. 12.07.2021.

And in terms of feet, the average building rates in Kenya stretch from Shs 3,135 per square foot to about Shs 6,785 per square foot. In this method, the total length of the building’s wall is measured then the total length of this wall is calculated with rate. Plinth area cost estimate is prepared on the basis of plinth area of building which is the area covered by external dimensions of building at the floor level and plinth area rate of building which is the cost of similar building with specifications in that locality.

iv) Cost of architectural features @1% of building cost. ... Plinth area estimate.

Rough Cost Estimate of the building is generally conducted by Plinth Area Basis method. Developers typically use a multiplier of 1.25 on carpet area to arrive at super built-up area. Plinth area estimate can be achieved by multiplying the values of plinth length, plinth width & plinth area rate. ft. How to calculate super built up area? and their cost of the building is 1,82,00,000/-. 17.

i) Plinth area rate 4500 SSP per M 2 ii) Cost of water supply @7½%of cost of building.

for obtaining the administrative approval of the Government.

The similar building is constructed nearby area having a plinth area is 2500 sq.m. Jun 2, 2018. 2. Plinth Area Rate helps to prepare rough cost estimates per square meter for construction of …

The value of this calculation is the value of the building.

Your Comments. A detailed estimate or item rate estimate is the most correct estimation because it assesses each item individually. 2.

Built-up area is considered to be 70-80% of the super built-up area.

Plinth area cost estimate is prepared on the basis of plinth area of building which is the area covered by external dimensions of building at the floor level and plinth area rate of building which is the cost of similar building with specifications in …

B. and from following data. This cost estimate is prepared by estimating the cost per plinth area of a type of construction present in the particular locale.

10 to 15%. Therefore, ft. Construction Estimate ₹ 1224000 Rs.

Sand in m3. Developers typically use a multiplier of 1.25 on carpet area to arrive at super built-up area. ft, then the built-up area is 700 – 800 Sq. Plinth area is the covered built-up area measured at the floor level of any storey or at the floor level of the basement.

Repair estimate The carpet area is the area that can be used to spread a carpet inside the house.

* New Plinth Area Rates on 01.04.2021 applicable w.e.f.

Plinth area estimate. Here the plinth area is referred as, external plinth area of the building at floor level. 2. DKT. In this method, the entire proposed constructing area of the building is determined. Annual Repair Cost Estimate.

They are ideal for recognizing the plot concerning a specific individual.

Q6. PLINTH AREA The built up covered area of a building measured at floor level of any storey is called plinth area. Dear. To complete a cubic content estimate you take the plinth area x building height. Approximate quantities with bill method ... etc. A Plinth area estimate is done based on the plinth area of a building. the approximate estimate and the cost ofconstruction of aproject this may misguide the intention to undertake ... Sinularly the circulation area should be known in order to calculate the plinth area of a building. For instance, if the plinth area is 100 sq.m and plinth area rate of a building in the same locality is 2000 per sq.m then, The cost for the building by the plinth area estimate will be 100 X 2000 = 200000. ... Plinth area method. Jayant Sheth.

The rates are being arrived at the dividing the total cost of construction with its plinth area.

ft, then the built-up area is 700 – 800 Sq. Mix Ratio and brickwork thickness.

10 to 15% iv) Cost of architectural features @1% of building cost.

Open staircase 3.

ft. 720 Sq.

JAI PRAKASH. Cube Rate Cost Estimate Explanation: 7) Which is an item rate estimate? The estimate is done to settle the financial prospect and policy matter that provides an overview of cost of the proposal after scrutinizing the …

It is mainly adopted for calculating the cost of the following buildings: ... For 1 meter cube area the costs of all floors are equal in costs. A percentage 5 to 10% is allowed for contingencies. It is measured by adding areas of utility ducts surrounded by property unit, internal and external walls to the carpet are. (a) Line plan with brief specifications. ₹ 1794500 Rs. should not be include in it.

3M. 9. Plinth Area Cost Estimate.

* Previous Plinth Area Rates 2020, 2019, 2012 & 2007 amended / clarified up to date.

vi Cost of roads & Lawns @5% vii) Cost of P.S.& contingencies @4% 2.

4500 per sqm ii) Cost of water supply @7½ %of cost of building. Going by the ‘Estimate report on bill of Quantities 2017’ published by … Relevant cost indices with reference to base 100 as 1.1.1992 ... the preliminary estimates may be prepared on the basis of these plinth area rates.

This estimation is based on basic construction like wall, ceilings, lighting, flooring.

The plinth area estimate for a building is prepared by multiplying the plinth area of building with the plinth area rate. Methods Of Approximate Estimate: A. This is a common way to estimate the costs of constructing multi-story buildings. Plinth Area Estimate. A. It is also a measure of usable space of building.

Plinth area rate is linked with the Drawings of the building and specification used in construction and type of building i.e house, office, store etc.However for general specification the rate may be from Rs 10000-00 to 12000-00 per sqm. Finally abstracting and billing is done.This is prepared in two stages.1.

5 to 10%. ... Plinth Area is measured up to outer edges of the walls. If plinth area is 1000 sqm then what will be estimate for annual maintenance of building .

Cube Rate Cost Estimate.

Simply it can be also stated as the roof covered area of a building. Construction Cost in Lacs ₹ 16.49 Lacs ₹ 17.945 Lacs ₹ 20.37 Lacs: Cost / Sq.ft ₹ 1700 ₹ 1850 ₹ 2100

5m – (0.23 x2) m = 4.54m.

Construction Cost in Lacs ₹ 12.24 Lacs ₹ 13.32 Lacs ₹ 15.12 Lacs: Cost / Sq.ft ₹ 1700 ₹ 1850 ₹ 2100 In the Plinth area method, the cost of construction is determined by multiplying the plinth area with the plinth area rate.

The rates mentioned as per sqm or per meter refers to the area or the running meter length of respective service as calculated from the layout plan.

For example, if the cost per square meter in your local area is from Ksh.30,000, and the plinth area of a 3 bed-roomed bungalow is 100 SQM, then, the total costs will be 100m2 X Ksh.30,000/- = Ksh.

Built up Area/Plinth Area: It is the area that a building comprises of in plot area is called as Built up area.

Which of the following is necessarily an accurate estimate? 4.1.2.

Plinth Area or Built-Up Area means total covered area of the building unit. It is the net usable area of the apartment.

D. Courtyard area. Calculate the cost of construction using the plinth area method when the plinth area and plinth area rate of a plot are 10 m2 and Rs. c. Determine the cost of services that are based on building cost. ft. ₹ 1512000 Rs.

Q4. It may be assumed that 30 % of the built up area will be taken by the corridors, verandas, lavatories, staircase, etc. 5. Calculate the approximate estimate of a four storey building, if the total plinth area is 300 square metres per floor and height of floor is 3 m. The cubical content rate is Rs. Your name: Your Email: Your Comments: 5.

rooms) are worked out from the users requirements and about 35% of it is added for thickness of walls, circulation and waste to obtain the approximate total plinth area. 2.

Building Cost = Plinth Area * Rate per square meter.

Area cost per square meter varies from one location to another as well as the type of finishing. It may be assumed that 35 % of the built-up area will be taken by the corridors, verandas, lavatories, staircase, etc. should not be include in it. iv) Cost of architectural features @1% of building cost. ft. 970 Sq. ft. Construction Estimate ₹ 1649000 Rs.

4 17.

The dimensions are taken directly from the drawings and quantities of each item are calculated. #1. sir, i want to calculation of cpwd plinth area rate for maintenance works . Mortar Thickness in mm.

(a) Line plan with brief specifications. Advantage of Estimate. Calculate the approximate estimate of a four storey building, if the total plinth area is 300 square metres per floor and height of floor is 3 m. The cubical content rate is Rs.

Rough cost estimate The rough cost estimate may be prepared on the following basis for different types of projects: 1. This area is known as Plinth Area. DPAR’ 92 : Delhi Plinth Area Rate is a document which is prepared by Central Public Works Department for …

The Plinth area should be calculate for a roof area of a building by taking external dimensions, excluding the plinth offsets.

ft.

The approximate estimate is prepared from the practical knowledge and cost of similar works. Cubic rate or cubic meter method. Terrace Area 2. The plinth-area method of preparing estimate gives the approximate cost of the building to be constructed.

• The rate being deducted from the cost of similar buildings having similar heights, construction and specifications in the locality. m. The following areas should be excluded from the calculation of the Plinth Area: 1. Tue Sep 08, 2015. It includes the thickness of the internal wall but excludes the balcony or terrace. The following documents are attached with the estimate.

Cube rate is established in this method. • Plinth area estimate is determined by measuring the plinth area of the building and multiplying by the plinth area. These estimates include actual quantities of items as well as scheduled rates. Example- For 1,000 sqft plinth area and INR 1,000 cost per sqft, the cost of a single-storey house is INR 10,00,000. ASSIGNMENT NO 01 QUESTION 01 Prepare a Rough-cost Estimate of a residential building project with a total plinth area of all building of 1500 sq.m.

* Building Cost Index for Various Places in India.

Plinth Area Basis. 2,000 per cubic metre and the profit of the contractor is 10% of the total cost. Accordingly this office has prepared an estimate on the basis of CPWD Plinth Area Rate 2012 for Construction of Hospital and adopting specification as per Annexure-II and green building norms. ii) Plinth area of each dwelling = 600m2 iii) Plinth area rate = Rs.

• Prepare a Rough-cost Estimate based on unit costs of per unit plinth area basis of a four storeyed office building having a carpet area of 2000 sq.m. This estimate is prepared if various building are to be considered.It is prepared on the basis of plinth area.Plinth area means length X breadth area of roof portion excluding plinth offset.

Civil Engineering Objective Questions. Example 1 .1: Prepare an approximate estimate of building project with totalplinth area of all building is 800 sqm. Preliminary. Cost estimates are broken down into levels to ensure accuracy at every phase of the project. Prepare a preliminary estimate of a building having a plinth area equal to 1600 square meters. Plinth area.

How to calculate built-up area? The following documents are attached with the estimate. First, let us convert the … Area of Construction: 970 Sq. It … 1) Prepare approximate estimate of new building having a plinth area is 2000 sq.m. Revised Cost Estimate. 4. in the plinth area. It is the approximate cost estimate in which a building’s plinth area is multiplied by the prevailing plinth area rate to get the building cost. ₹ 2037000 Rs. Plinth area estimate is obtained by multiplying plinth area of building with plinth area rate. Cube rate estimate In cube rate estimate, third dimension height is also considered. Preliminary survey of project includes: Q5. * Plinth Area Rates for Specialised E & M Services. 1.2 Cubical Content Method Since the plinth area method doesn’t account for the height of the building, it gives an erroneous estimate of the building storey heights are different. How to calculate built-up area? Total Estimated Cost of Building Project = Internal Gross Floor Area x Cost per m2. It is a basic cost estimate in which the plinth area of a building is multiplied by the current plinth area rate to obtain the cost of the building. The rates are being arrived at the dividing the total cost of construction with its plinth area. Plinth area cost estimate is prepared on the basis of plinth area of building which is the area covered by external dimensions of building at the floor level and plinth area rate of building which is the cost of similar building with specifications in … Now.

Mustafam. The covered area of the proposed building is 150 m2 and it includes a rear courtyard of 5 m × 4 m. Loft area 4.

5,000/-per m2 iv) Cost of water supply & sanitary arrangements @12½% v) Electrification at 7½% of cost of building. Generally, carpet area is 75% of super built up area.

Extra for water supply and sanitary installations = 5 % of the building cost. Plinth Area Estimate: Estimate of plinth area is taken out on the basis of plinth area of the building.

Explanation: Image Not Yet Uploaded! Pick up the item of work not included in the plinth area estimate. Square Metre Or plinth Area Method: This rough estimation is done by selecting the price of 1 square meter area of a building. The rate of unit plinth area is estimated by considering the cost of similar buildings which are already present in the locality. The following are the common methods used to estimate buildings: Plinth area or square meter method. For development of site, it would be desirable to design all the components under head 5 and cost estimate may be done …

Types of Cost Estimates.

This estimate is usually prepared to know the rough cost of the project at initial stages of the project. The average cost of construction in Kenya ranges from Kshs 33,450 per square metre to about Kshs 72,400 per square metre. Floor Area includes the internal area of all the rooms.

Must read: How to calculate the number of bricks.

Plinth area and carpet area of a building is measured for estimation and calculation of building cost. Plinth Area Cost Estimate.

A) Plinth area rate method Problem no.